The Texas Department of Transportation has published the list of qualified teams for the SH 288 Toll Lanes Project in Harris County.
The P3 contract involves the development, design, construction, financing, operation and maintenance of tolled lanes, general purpose lanes and associated facilities along an approximately 10.3-mile segment of State Highway 288 from U.S. Route 59 to the Harris County line at Clear Creek in Harris County.
The qualified teams are as follows:
Mobility Alliance
Blueridge Transportation Group
SH 288 Mobility Partners
The RFQ was launched on 17 May 2013.
The Texas Department of Transportation has developed a project that consists of a 10.3-mile section of SH 288 from US 59 to the Harris County line at Clear Creek in Harris County. The Project is expected to be completed in phases (Initial Phase and Ultimate Phase).
The Initial Phase of the Project includes the following:
TxDOT may include in the procurement the Texas Medical Center Connector. The TMC Connector includes the design, construction, maintenance, and operation of a two lane two-way connector up to 1.3 miles in length. The Ultimate Phase of the Project is the ultimate project configuration and includes the following: