Tunnel Euralpin Lyon-Turin (TELT) in France has awarded the contract for works package 2 for the Lyon–Turin rail line project to Vinci Construction.
The work package includes the construction of the 57.5 km tunnel that will connect Saint-Jean-de-Maurienne (France) and Susa (Italy). The works involve digging 25 km of the tunnel using three tunnel boring machines and 21 km of the tunnel using conventional methods as well as creating 71 safety tunnels and several galleries.
The construction works are expected to last five years. The contract is valued at EUR1.43 billion (US$1.68 billion).
COIMA SGR and its partners Covivio and Prada Holding have announced that Skidmore, Owings & Merrill (SOM) will design the Olympic Village for the 2026 Milan-Cortina Olympics. The project is part o...
Read moreBNP Paribas has announced the first close for its BNP Paribas European Infrastructure Debt Fund II after getting commitments of more than EUR300 million (US$355.89 million) from institutiona...
Read moreThe Webuild Group has won a construction contract (Design-Build) for Fiumefreddo-Taormina/Letojanni Functional Lot 1, which is a subsection of the Giampilieri-Fiumefreddo section of the railway,...
Read moreVauban Infrastructure Partners has reached a hard cap close of EUR2.5 billion (US$2.95 billion) for its third core infrastructure fund. Vauban Core Infrastructure Fund III will take a buy-and-h...
Read moreVauban Infrastructure Partners has reached a hard cap close of EUR2.5 billion (US$2.95 billion) for its third core infrastructure fund. Vauban Core Infrastructure Fund III will take a buy-and-h...
Read more