Metrolinx and Infrastructure Ontario in Canada have selected Bechtel for the development of the Ontario line PPP project in Toronto.
Bechtel will be responsible for the construction of the 15.6-kilometer rapid transit line through downtown Toronto to the Ontario Science Centre. The project will require a mix of surface, elevated, and underground tracks to bring transit to more communities and will travel through dozens of neighborhoods.
The northern terminus will be located near the Science Centre, while the southern terminus will be at or near Exhibition Place and Ontario Place along the City's waterfront. The project includes 15 stations, six interchanges with other modes of transit, passenger pick-ups and drop off areas, and a maintenance and storage facility. The project is planned to be completed by the end of 2030.