The government of North Macedonia has picked a joint venture between US engineer Bechtel and Turkish contractor Enka to build two motorway projects in North Macedonia.
Two motorways with a total length of 110 km are:
In 2023, construction will begin. By the end of 2028, all of the work on the roads in North Macedonia will be finished.