China Everbright Greentech Ltd. has secured the Heilongjiang Daqing Solid Waste Integrated Treatment Project (Daqing Project) Phase I, with an investment of approximately CNY433 million (US$64.56 million).
Daqing Project will be developed in two phases. Phase I of the project is designed with an annual hazardous waste incineration processing capacity of 30,000 tonnes and an annual hazardous waste integrated utilization capacity of 50,000 tonnes. Daqing Project Phase II is designed with an annual oil sludge integrated treatment capacity of 200,000 tonnes. Located in the Hongwei Industrial Park of Daqing City, the project will be mainly responsible for the collection and treatment of hazardous waste in the city and its surrounding areas.