The State of Alaska Department of Transportation and Public Facilities (DOT&PF) is seeking qualified applicants to submit an Expression of Interest (EOI) outlining their interest, capabilities, and expertise in the management, development and operation of the North International Terminal at the Ted Stevens Anchorage International Airport (ANC) in Anchorage, Alaska.
The North Terminal is a 310, 000 sq. ft facility built in 1982 with updates made in 1988 and 1993. As originally designed, it can support eight gates capable of accommodating Boeing 747 aircraft. Currently, there are six gates available and 17,000 sf of concession space. The concession space is located in the middle of the terminal to provide convenient access for passengers.
The North Terminal is a three-floor facility. The ground floor provide curbside access, the facility's main lobby, ticketing, baggage, processing, baggage claim, and offices. Passenger screening and boarding occur on the second floor, which contains departure lounges, concessions space, and offices. The third-floor contains VIP lounge space, a smoking room, offices, and mechanical equipment.
The deadline for the submission of interest is on November 29, 2019.