The grant plan presented by the National Land Transport Agency (ANTT) for the concession of BR-153/414/080/TO /GO road project was approved by the Ministry of Infrastructure in Brazil.
The concession consists of the exploitation for 30 years of the infrastructure and the provision of the public service of recovery, conservation, maintenance, operation, implementation of improvements and expansion of the capacity of the BR-153 highways / 414/080/TO/GO, on the 624.1 km stretch of BR-153/TO/GO, between the junction with TO-070 (Aliança do Tocantins) until the junction with BR-060 (Anápolis); on the 139.6 km stretch of BR-414/GO, between the junction with BR-080/GO-230(A)/324 (Asunción de Goiás) to the junction with BR-153/GO-222/330 (Anápolis); on the 87 km stretch of BR-080/GO, between the junction with BR414/GO-230 (B) (Asunción de Goiás) to the junction with BR-153(A)/GO-342(B).
The BR-153/414/080 / TO / GO road system comprises a total length of 850.7 km, constituting the main link between the Middle-North of Brazil (states of Tocantins, Maranhão, Pará, and Amapá) with the Central-South Region of the country, covering the following municipalities:
The estimated investment for the project is BRL 8.46 billion (US$ 1.61 billion) and the operating cost for the project is BRL 6.18 billion (US$ 1.17 billion).
Among the main works are the duplication of 623.4 km of the highway, 22.3 km of additional lanes and the construction of 21 walkways for pedestrians.
https://www.infrapppworld.com/report/latin-america-caribbean-ppp-market-2019
You can also find more free reports here.
The State Government of Sao Paulo in Brazil has extended the concession expiration period to the Move Sao Paulo consortium, responsible for the construction of Line 6 of the Metro - Orange PPP project. The new contract expiration deadline is May 24, 2020.
Read more
National Land Transportation Agency (ANTT) in Brazil has selected Brazilian company CCR S.A. as a winner for the concession of BR-101/SC road project in the state of Santa Catarina.
Read more
Brazil's national land transport agency ANTT has approved the proposal for BR-153/080/414/GO/TO road concession connecting the states of Goiás and Tocantins. BR-153 is currently considered one of the main national integration roads in Brazil. The stretch of this highway included in the future Concession is 624.1 km long, 598.3 km of which is a single lane. The newly approved proposal includes two additional sections (BR 414 and BR 080).
Read more
The IDB Group has issued US$ 240 million loan financing for the Skyrail Bahia project in Salvador de Bahia. IDB will provide financing to pay for CAPEX and other project costs during construction (estimated at US$ 842 million) through a US$240 million loan with an up to 20-year door-to-door tenor.
Read more
Transport Agency of the State of Sao Paulo (Artesp) in Brazil has announced consortium formed by Patria Investments and GIC sovereign wealth fund as winning bidder for Piracicaba-Panorama, also known as Pipa road concession in Sao Paulo.
Read more